СOMPLETED PROJECTS

2020

Coal chemical plant with a capacity of 30 thousand tons per year for raw materials in the Republic of Kazakhstan. In May 2020, the first phase was launched.

2020

2020

Start of commissioning of the Coal Chemical Plant with a capacity of 30 thousand tons per year for raw materials "UGH-30" in the Republic of Kazakhstan

Construction of the first stage of the Petrochemical Plant with a capacity of 2 million tons per year for raw materials in the Republic of Kazakhstan

2019

Project: Design of a coal chemical plant with a capacity of 30 thousand tons per year for raw materials "UGH-30" in the Republic of Kazakhstan

Project: Design of a petrochemical plant with a capacity of 2 million tons per year for raw materials in the Republic of Kazakhstan

2019

2018

Project: Reconstruction of the refinery with the aim of introducing the Installation of catalytic conversion of medium fractions "UPKdt-150" and installation of gas separation and compression of propane / butane in the Akmola region of the Republic of Kazakhstan
The catalytic conversion unit for light and medium-sized hydrocarbons was launched on the basis of the C41 / 25 unit in the Amur region. As a result of catalytic conversion on zeolite-containing catalysts, the freezing point of diesel fuel is reached -44 degrees Celsius.

2016

Model catalytic cracking of vacuum gasoil launched in Indonesia

2013

Installing C41/15 mounted in the Tomsk region

2013

2011

Installing C 42/25 mounted in the Republic of Komi

Installing C 41/15 launched in the Republic of Evenkia. The capacity from 10 to 12 thousand tons annually

Installing C 41/10 started in the Amur region. The capacity from 10 to 12 thousand tons annually

2010

Installing C 44/500 launched in the Republic of Kazakhstan. Capacity 500 thousand tons annually

Installing C 42/25 was launched in Donetsk, Ukraine. The capacity 25 thousand tons annually.

2010

2009

Two C33/35 launched in the Republic of Kazakhstan. The performance of each of 35 thousand tons annually.

2008

Installing C 41/10 launched in Tomsk region. The capacity from 10 to 12 thousand tons annually.

Installing C 31/10 launched in Tyumen region. The capacity from 10 to 12 thousand tons annually.

2008

2006

Installing C 31/10 started in the North of the Tomsk region. The capacity of 10 thousand tons annually

Installing C 31/10 was launched in Novosibirsk. The capacity of 10 thousand tons annually

Installing C 31/10 launched in Novosibirsk region. The capacity of 10 thousand tons annually

Experimental facility C 31 running Tomsk region. The capacity of 10 thousand tons annually